AKW - Mapei - Wet Floor Showering (5m TANKING KIT)
1 x 5 Kg Drum of Mapegum WPS
1 x Mapei Primer G
1 x Mapeband pe120 5m Roll
£124.00
£103.33
SKU
21320
- Waiting time 1-2 hours between each coat; 12-24 hours before laying ceramic
- Complete drying: 5 hours (2mm of thickness at +23°C)
- Flexible, anti-fracture membrane
- Simple brush or roller application
- Can be used on the following; plasterboard, gypsum or cementious render, lightweight cement block and marine plywood
- Ready to use - solvent free
- Single component
- Storage: 24 months (protect from frost)
Manufacturer | AKW |
---|---|
Is Featured | No |